How We Can Help
LPS inspection per OTSZ 54/2014 BM regulation §279–281. LPS design per EN 62305 — risk assessment (EN 62305-2), external LPS (air-termination, down-conductor, earth-termination), internal LPS (SPD, equipotential bonding). Inspector qualification per 9/2015 BM §10 (3)–(4). LPS inspection is NOT the same as electrical safety inspection (VBF).
Platforms & Tools
How We Work
Risk Assessment
Risk analysis per EN 62305-2, LPL determination.
Design / Survey
Air-termination, down-conductor, earth-termination design (EN 62305-3) or survey.
On-site Inspection
External LPS inspection. Internal LPS: SPD, equipotential bonding. Earth resistance, bonding continuity measurements.
Qualification Report
OTSZ qualification report (PASS/FAIL), measurement protocols, photo documentation, defect list.
Remediation
Remediation plan, construction oversight, re-inspection.
Let's discuss your project
Request a custom quote — we respond within 24 hours.